Yes, a meter or a CT is needed for export contorl. Once a meter or a CT is connected, you should configure the inverter via LCD screen(App for non-screen version). Go to setting item 'Export control' to enable merter(or CT) and then confirm how much power to inject to the grid. If you want zero injection, you just need to set the value to 0.
Note: Three phase string inverters are not compatible with CT.
Comments
0 comments
Please sign in to leave a comment.