How to mount the Adapter Box G2? Peter 08 April 2025 12:20 Install horizontally on a wall using the included self-tapping screws. Avoid direct sunlight and ensure proximity to the heat pump. Drill 6 mm holes (depth ≥30 mm) and secure with expansion tubes. Related articles How is the Adapter Box G2 powered? Comments 0 comments Please sign in to leave a comment.
Comments
0 comments
Please sign in to leave a comment.