How to mount the Adapter Box G2? Peter 08 April 2025 12:20 Install horizontally on a wall using the included self-tapping screws. Avoid direct sunlight and ensure proximity to the heat pump. Drill 6 mm holes (depth ≥30 mm) and secure with expansion tubes. Related articles How is the Adapter Box G2 powered? Which inverters are compatible with the Adapter Box G2? How to fix grid lost fault? What are the key application scenarios for Adapter Box G2? Comments 0 comments Please sign in to leave a comment.
Comments
0 comments
Please sign in to leave a comment.