What is the switchover time to EPS output during a grid failure for SK-SU inverter? Peter 30 May 2025 11:33 The switchover time is specified as less than 5 seconds (<5s). Related articles What happens during an EPS event (grid failure) if the connected load exceeds the inverter's EPS rating? What battery types and voltages are compatible with X3-Hybrid G2 inverter? Why it shows registration number is invalid? Under EPS mode, do I still need to install a meter or CT? Comments 0 comments Please sign in to leave a comment.
Comments
0 comments
Please sign in to leave a comment.