Yes, using the "Parallel Function." One charger acts as the "Primary" and communicates with the power source (inverter/meter), intelligently allocating available solar or grid capacity between itself and the "Secondary" charger. The setup requires specific communication cabling between the units.
Comments
0 comments
Please sign in to leave a comment.