Are the “slave +/-” and “master +/-” in the BMS parallel box G2 in parallel? Peter 23 October 2024 10:22 Yes, they are in parallel, the battery voltage on the cloud should be the single string battery voltage. Related articles Does X3-ULTRA inverter support to connect Half wave loads? How to do wifi connection? In datahub settings, what is the "DRED Control" function used for? How many batteries can I conenct to BMS parallel box G2? In parallel system, if the master inverter stops working, can the slave still work normally? Comments 0 comments Please sign in to leave a comment.
Comments
0 comments
Please sign in to leave a comment.