First, loosen the M5 screws on the terminal block. Strip 10-13mm of insulation from the cables, insert them into ferrules, and crimp. Insert the ferrules into the corresponding ports (L1, L2, L3, N) and tighten the screws to 25±0.1 Nm.
First, loosen the M5 screws on the terminal block. Strip 10-13mm of insulation from the cables, insert them into ferrules, and crimp. Insert the ferrules into the corresponding ports (L1, L2, L3, N) and tighten the screws to 25±0.1 Nm.
Comments
0 comments
Please sign in to leave a comment.