Can I replace the CTs with 2 meter in the Micro Grid solution diagram?
In the Micro Grid solution diagram, you can replace the CTs with 2 meters or one meter plus one CT
-
Can I replace the CT with meter in the generator solution diagram?
You cannot replace the CT with a meter if there is a possibility of power export to the generator because the CT is more sensitive.
-
Is there some special requirement for X3-ULTRA parallel cable?
The communication cable length between two parallel inverters should not exceed3 meters, and the total cable length of all parallel inverters should not exceed 30meters.
-
What is the maximum parallel cable length for X3-ULTRA inverter?
The communication cable length between two parallel inverters should not exceed3 meters, and the total cable length of all parallel inverters should not exceed 30meters.
-
How do I set the price for selling power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02
-
How do I set the price for buying power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02
-
How do I set the rate for buying power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02
-
How do I set the tariff for buying power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02
-
How do I set the tariff for selling power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02
-
How do I set the rate for selling power back to the grid
Please refer to this link: https://kb.solaxpower.com/faq/detail/8af1c4b2934c70480193611628f80d02