You must report the failure to Solax or your installer within one month (4 weeks) of the failure date. Claims made later will not be considered.
You must report the failure to Solax or your installer within one month (4 weeks) of the failure date. Claims made later will not be considered.
Comments
0 comments
Please sign in to leave a comment.