FAQ
Follow Section
- What is the historical data granularity stored on the cloud?
- If I have a parallel system with multi hybrid inverters, does it requre pocket WiFi/LAN for each inverter?
- How often is the data on the cloud platform updated?
- What is the Duration of storing historical data locally
- As an installer, what shall I do for commissioning?
- What is the limitation of connection cable length for CT or meter?
- Can I use a three phases meter for single phase inverter?
- When shoud I use CT and when shoud I use meter?
- Can I use no-SolaX brand of meter/CT?
- Can I charge at different current rate across the phases in 3-ph charging?
- Which size of cable should I use, What about breaker?
- Can I have my existing charger and Solax EV charger installed together without overloading my supply?
- Can I charge a single phase EV with a three phase charger?
- Does Solax EVC charger support OCPP 1.6j?
- What is the minimum charging level on the three phase solax EVC?
- Does the Solax EV charger support Vehicle to grid(V2G)?
- Which activation methods does Solax EVC charger support?
- Do I need solar pannels for Solax EV charger to work?
- What's the benefit to connect Solax EVC charger to Solax inverter?
- Why do we have to use Solax lithium-ion battery only?
- Can I use other brand battery?
- Could we use BMS parallel box with T30? If yes, could we connect up to 8×T30 with it?
- Does the Hybrid-G4 inverter support the Lead-acid battery?
- Can I make the cable myself for the battery connection instead of the Solax provided cable?
- What is maximum recommanded length between battery and inverters?
- Can I install T30 on wall?
- What is the energy consumption of the T30 battery for heating at low temperature?
- Could SolaX inverters firstly be installed without batteries and then wait some months before installing batteries?
- If I have a Solax Hybrid Inverter and a third-party String inverter in my house, how I can monitor the whole system?
- Does both single and three phases inverter support matebox?