Skip to main content
Solax Power Help Center Help Centre home page Solax Power Help Center
  • Submit a request
  • Sign in
  • Sign in
  • Submit a request
  1. Solax Power Help Center
  2. FAQ

FAQ

  • Is a meter connection mandatory for X3-Hybrid G2 inverter?​
  • What is the switchover time to EPS mode during a grid failure for X3-Hybrid G2 inverter?​
  • What battery types and voltages are compatible with X3-Hybrid G2 inverter?​
  • What is the maximum number of inverters that can be connected in parallel for X3-Hybrid G2 inverter based on on-grid operation?​
  • What are the key differences between Version E and Version C for X3-Hybrid G2 inverter?​
  • What do the model number suffixes (E, C, D, N) mean for X3-Hybrid G2 inverter?
  • Does the X-Smart G1 inverter support battery storage?​
  • Can I use third-party meters?​
  • What does "Bus Volt Fault" mean?​
  • How do I set export control for my X1-Smart G1 inverter?​
  • How should PV modules be grounded?​
  • What surge protection is needed for X1-Smart G1?​
  • Is an external RCD required for X1-Smart G1?​
  • What cable size is required for AC grid connection of X1-Smart G1 inverter?​
  • Can I install the inverter of X1-Smart G1 outdoors?​
  • What is the difference between models ending in "-D" and "-N" for X1-Smart G1?​
  • How does the "GMPPT" function mitigate shading losses and what are the scanning mode trade-offs?​
  • What are the potential consequences of incorrect "Meter Direction" setting?​
  • What is the AFCI (ArcCheck) functionality, its self-test procedure, and fault clearing options.​
  • What is the function of "Earth Detect" in X1-Smart G2 settings and what happens if it's enabled and grounding is absent?​
  • Can you describe the operational difference between "Soft Limit" and "Hard Limit" in Export Control or General Control. in X1-Smart G2 settings?
  • Can you explain the procedure and purpose of the "Check Meter/CT" function in X1-Smart G4 settings?.​
  • What are the specific clearance requirements for installing multiple X1-SMART G2 inverters?​
  • What is the significance of the "T" suffix in models like X1-SMT-10KT-G2?​
  • In parallel system, do I need to set the safety code for slave inverter?
  • What is the switchover time to EPS output during a grid failure for SK-SU inverter?​
  • How is communication established between the SK-TL (Hybrid Ready) inverter and the external BMU?​
  • What happens during an EPS event (grid failure) if the connected load exceeds the inverter's EPS rating?
  • How does the "Force Time Use" mode operate, and what user-configurable options does it offer for Sk-SU inverter??​
  • Why is a Type B Residual Current Device (RCD) mandatory on the AC supply side for SK-SU inverter?​
  • « First
  • ‹ Previous
  • Next ›
  • Last »
Solax Power Help Center
English (US) Italiano (Italia)
Powered by Zendesk